The use of geosynthetics to reduce or replace traditional layers is now an accepted part of track-bed construction and renewals around the world. When correctly specified and installed, geosynthetics are proven to:
- Enhance track performance
- Significantly extend design life
- Reduce the time required to renew a specific
length of track (or allow more to be renewed
in a fixed time) - Reduce overall material costs